Deeside, Flintshire
Commercial solar in Deeside
Funded solar PV and battery storage for Deeside businesses — zero upfront cost, a fixed rate below the grid, fully managed.
Deeside is one of North Wales’s biggest manufacturing bases, with aerospace, automotive engine production, steel processing and large logistics operations. The extensive roofs and steady shift-based demand on its industrial park suit on-site solar, and a PPA delivers it with zero upfront cost.
Deeside carries one of the densest concentrations of industry in North Wales. Aerospace manufacturing sits close by at Broughton, Toyota builds engines on Deeside itself, steel is processed at Shotton, and the Deeside Industrial Park is packed with manufacturers and distribution operators. Many of these plants run shifts that draw heavy, steady power across daylight hours, and their large building footprints give plenty of roof area for solar.
PPA Funding introduces Deeside businesses to funded solar and battery storage. A Power Purchase Agreement means no capital cost: the funder installs, owns and maintains the equipment, and you pay a fixed price for the electricity it generates, guaranteed at least 30% below grid rates. The system becomes yours for £1 after roughly 20 years, and hire purchase, leasing and outright purchase are available as alternatives.
Local sectors we help
- Aerospace and advanced manufacturing
- Automotive and engine production
- Logistics and steel processing
No upfront cost · No obligation
Why PPA Funding
Solar for Deeside businesses, fully funded
Industry Experts
Proven track record in large-scale solar and battery installations.
End-to-End Service
We take care of everything, from design to maintenance.
Leading PPA Rates
Exclusive access to the best PPA rates from multiple funders — immediate savings and long-term stability.
Sustainable Impact
A holistic approach that fully future-proofs your business with sustainable, clean energy.
How it works
Getting solar for your Deeside site
- 01
Free Energy Assessment
We take a quick look at your energy use, site setup and future needs to design the right renewable system for your business. Just fill out our short survey to get started.
- 02
Bespoke PPA Proposal
After reviewing your energy needs, we send a tailored PPA proposal — built to help you save money from day one and lock in long-term energy stability.
- 03
Installation & Setup
Once your PPA is agreed, our team handles everything — from design to installation — ensuring a smooth switch to renewable energy with zero hassle.
- 04
Immediate Savings
As soon as your system is up and running, you start saving. On-site energy cuts your bills and protects your business from rising grid prices.
- 05
Ongoing Maintenance
We fully manage your system for you — keeping it running efficiently and reliably, so you get all the benefits of green energy without the upkeep.
Questions
Commercial solar in Deeside — FAQs
Can a large manufacturing plant on Deeside Industrial Park be fully covered?
Larger roofs can host larger arrays, and the more electricity a plant uses during the day the more of that generation it absorbs on site. A survey sizes the system to your demand, and battery storage can be added to capture output for evening or night shifts.
Do you cover the wider Flintshire and Wrexham area?
Yes. We support businesses across Deeside, Flint, Mold, Wrexham and the surrounding North Wales border, including units along the A548 and A494.
More locations
Commercial solar across the UK
Popular guides
Explore commercial solar, funding options, solar by industry or our guides.
Cut your Deeside energy bills with funded solar
Get a free, no-obligation PPA proposal — a tailored system design and a fixed rate at least 30% below your current supplier.
- £0 upfront cost
- Rates 30%+ below the grid
- Fully funded & maintained
- No obligation