Redcar, North Yorkshire
Commercial solar in Redcar
Funded solar PV and battery storage for Redcar businesses — zero upfront cost, a fixed rate below the grid, fully managed.
Redcar, once a steel town, is now a focus for offshore-wind manufacturing and the Teesside process industry, with large coastal industrial sites under active redevelopment. Extensive roofs and heavy daytime demand make these strong candidates for solar, funded through a PPA with zero upfront cost and a fixed rate below the grid.
Redcar was a steelmaking town for generations, and since the works closed the surrounding land has become one of the largest industrial redevelopment sites in the country, with offshore-wind manufacturing, process industry at nearby Wilton and clean-energy projects moving in. The scale of building and land here, combined with steady industrial power demand, makes it well suited to both rooftop and ground-mounted solar.
PPA Funding introduces Redcar businesses to funded commercial solar and battery storage through a Power Purchase Agreement. There is no upfront cost: the system is installed, monitored and maintained for you, and you buy the electricity at a fixed rate at least 30% below grid prices. At the end of the roughly 20-year term the equipment becomes yours for £1.
Local sectors we help
- Offshore wind manufacturing
- Process industry and chemicals
- Logistics and coastal industry
No upfront cost · No obligation
Why PPA Funding
Solar for Redcar businesses, fully funded
Industry Experts
Proven track record in large-scale solar and battery installations.
End-to-End Service
We take care of everything, from design to maintenance.
Leading PPA Rates
Exclusive access to the best PPA rates from multiple funders — immediate savings and long-term stability.
Sustainable Impact
A holistic approach that fully future-proofs your business with sustainable, clean energy.
How it works
Getting solar for your Redcar site
- 01
Free Energy Assessment
We take a quick look at your energy use, site setup and future needs to design the right renewable system for your business. Just fill out our short survey to get started.
- 02
Bespoke PPA Proposal
After reviewing your energy needs, we send a tailored PPA proposal — built to help you save money from day one and lock in long-term energy stability.
- 03
Installation & Setup
Once your PPA is agreed, our team handles everything — from design to installation — ensuring a smooth switch to renewable energy with zero hassle.
- 04
Immediate Savings
As soon as your system is up and running, you start saving. On-site energy cuts your bills and protects your business from rising grid prices.
- 05
Ongoing Maintenance
We fully manage your system for you — keeping it running efficiently and reliably, so you get all the benefits of green energy without the upkeep.
Questions
Commercial solar in Redcar — FAQs
Can I use both roof and open land for solar at my site?
Where you have spare, suitable land as well as roof space, a ground-mounted array can be added to increase generation. We assess both options at survey and design the system around your available space and consumption.
Do you cover Redcar and the wider Tees Valley?
Yes. We work with businesses across Redcar, Marske, Guisborough and the Redcar and Cleveland area, and throughout the Tees Valley, with nationwide coverage from Telford.
More locations
Commercial solar across the UK
Popular guides
Explore commercial solar, funding options, solar by industry or our guides.
Cut your Redcar energy bills with funded solar
Get a free, no-obligation PPA proposal — a tailored system design and a fixed rate at least 30% below your current supplier.
- £0 upfront cost
- Rates 30%+ below the grid
- Fully funded & maintained
- No obligation