Skip to content
PPA Funding

Durham, County Durham

Commercial solar in Durham

Funded solar PV and battery storage for Durham businesses — zero upfront cost, a fixed rate below the grid, fully managed.

Durham is a university and cathedral city with an economy led by education, tourism and professional services, supported by science and business parks across the county. Campuses, hotels and offices use power through the day, so on-site solar offsets genuine demand, and a PPA installs it at zero upfront cost.

Durham’s economy is shaped by its university and by the tourism drawn to its cathedral and castle, a UNESCO World Heritage Site. Education, hospitality and professional services dominate the city, while the surrounding county carries science and business parks and a base of manufacturing and technology firms. University buildings, hotels, offices and laboratories all use electricity steadily through the day, which is the demand pattern that makes a rooftop solar system worthwhile.

PPA Funding introduces Durham businesses to funded solar and battery storage. Under a Power Purchase Agreement there is no upfront cost; the funder pays for, installs and maintains the equipment, and you buy the electricity produced at a fixed rate at least 30% below the grid. After about 20 years the system becomes yours for £1, with hire purchase, leasing and outright purchase available as alternatives.

Local sectors we help

  • Education and research
  • Tourism and hospitality
  • Professional services and science parks
Get my free quote

No upfront cost · No obligation

Why PPA Funding

Solar for Durham businesses, fully funded

Industry Experts

Proven track record in large-scale solar and battery installations.

End-to-End Service

We take care of everything, from design to maintenance.

Leading PPA Rates

Exclusive access to the best PPA rates from multiple funders — immediate savings and long-term stability.

Sustainable Impact

A holistic approach that fully future-proofs your business with sustainable, clean energy.

How it works

Getting solar for your Durham site

  1. 01

    Free Energy Assessment

    We take a quick look at your energy use, site setup and future needs to design the right renewable system for your business. Just fill out our short survey to get started.

  2. 02

    Bespoke PPA Proposal

    After reviewing your energy needs, we send a tailored PPA proposal — built to help you save money from day one and lock in long-term energy stability.

  3. 03

    Installation & Setup

    Once your PPA is agreed, our team handles everything — from design to installation — ensuring a smooth switch to renewable energy with zero hassle.

  4. 04

    Immediate Savings

    As soon as your system is up and running, you start saving. On-site energy cuts your bills and protects your business from rising grid prices.

  5. 05

    Ongoing Maintenance

    We fully manage your system for you — keeping it running efficiently and reliably, so you get all the benefits of green energy without the upkeep.

Questions

Commercial solar in Durham — FAQs

Would solar affect the appearance of a listed or historic building?

Panels are normally placed on newer, less visible roofs or on commercial units away from protected buildings, and any historic or conservation constraints are checked before design. Much of a site’s energy use can often be covered without touching a sensitive frontage.

Do you cover Chester-le-Street, Durham and the wider County Durham area?

Yes. We work with businesses across Durham, Chester-le-Street, Spennymoor and the wider County Durham area, including the science and business parks along the A1 and A167.

More locations

Commercial solar across the UK

Popular guides

Explore commercial solar, funding options, solar by industry or our guides.

Cut your Durham energy bills with funded solar

Get a free, no-obligation PPA proposal — a tailored system design and a fixed rate at least 30% below your current supplier.

  • £0 upfront cost
  • Rates 30%+ below the grid
  • Fully funded & maintained
  • No obligation